What the work consisted of?

Excavation & Manholes
Carry out an excavation through concrete to divert the pipe from the surface water manhole into the foul water manhole approximately 1 meter in length.
The pipework will then be surrounded with the appropriate granular backfill, and the area of excavation re-instated.

Time taken for the job: 1 day to complete.

Work we performed: 

  • Excavated and re-routed the pipework from the surface manhole into the foul manhole by breaking down the manhole wall. 
  • The internal manhole walls were made good 
  • The site was left clean and tidy.