What the work consisted of?
Manhole Cover and Frame Replacement
Following a CCTV Drainage Survey and Site Report at this property we found that MH1 FW was heavily corroded and unsafe

Time taken for the job: 1 day to complete.
Cost for job: £150+VAT

Work we performed:

  • Removed the old cover and excavated the old frame.
  • Installed and concreted the new frame and added the new cover.
  • The site was left clean and tidy.