Project Title: LU7

What the work consisted of?
Manhole Interceptor Replacement
Following reports of repeat blockages, we were called out to complete a drainage unblock in LU7. Upon clearing the blockage, we noticed that the interceptor trap was faulty. We recommended that this was to be replaced with a run-through to ensure the system would not become blocked again.

Time taken for the job: 1 day to complete.
Cost for job: £450 + VAT

Work we performed:

  • Conducted an internal manhole excavation
  • Removed faulty interceptor
  • Fitted a run-through
  • Backfilled and re-instated the manhole
  • Left site clean and tidy